Wednesday, July 18, 2012

DSE Deep Tub Install, Day 8 (July 7, 2012)


Today I modified and installed the trunk hinge brackets.  This is the last step of the deep tub install.


The right side is the original bracket modified














The left side is made from scratch via this template











No comments:

Post a Comment