Wednesday, July 18, 2012

DSE Subframe Connector Install, Day 1 (July 8, 2012)


Today I started installing the subframe connectors.














The floor pan is cut out to expose the torque box (from the Quadralink)






Test fit








Welding on the transmission crossmember bracket









No comments:

Post a Comment