Sunday, January 19, 2014

Final Assembly - Glove Box (January 13, 2014)


Nothing too ground breaking here, except that this is the "final" install of the glove box. The details of the glove box liner fabrication are back a ways in this build thread.

Liner goes in first. Thanks to mock up, it goes in like it was meant to be there in the first place.





The switch panel is next. These are for the Phantom ignition, VHX dash and cooling fan controls. Just below you can see the OBD connector for the EFI.


    

Assembling the door.







Mounting it to the dash.






Another thing to check off of the list !





    

No comments:

Post a Comment